Mardi 13 mai 2008 2 13 /05 /Mai /2008 23:25
This week we had help from Alex "little" brother, Pierre.

So they started by cleaning the area

then by rebuilding the top of the 2 outside back windows.


Looks very nice!!! Just missing to repoint it.....

Next of course was back to the CHAUX!


Here Pierre after he finally managed to put the bucket in place!  We are still on the same wall, it is taking its time....


This coming weekend we hopefully will finish this wall and start the other one.

Lastly few picture that Pierre took from the house.



MERCI PIERRE!!!

Par Lubertozzi - Publié dans : external
Ecrire un commentaire - Voir les 0 commentaires
Dimanche 6 avril 2008 7 06 /04 /Avr /2008 22:47
The roof is finally finished!


Apart from the Roof few things were done this past weekend, including alot of cleaning as it was a real mess inside...

1)One part of the wall had to be put done, because it was very very weak, it will be redone usine plasterboards...


2) EDF has finally replaced the eletricity board


3)Cleaning had to be done, as after the room and the wall down, the room was a real mess.


Everybody helps


4)An opening was made, from the corridor to the staircase to the loft to the living area, it will be an opening and not a door.
et voilaaa!


5)Finally we also had to fix the internal window, as when the wall opening was done, the lower part colapsed.


Next weekend we have to rebuild the wall, and repoint some of the internal wall. Woohoo!!!
Par Lubertozzi - Publié dans : external
Ecrire un commentaire - Voir les 1 commentaires
Dimanche 30 mars 2008 7 30 /03 /Mars /2008 21:22
Not much of the Roof was done this past week as the weather was so bad...

2 Velux windows were added, one missing...

The roof is supposed to be finished by the end of this week....
The bedroom floor was finished, the fireplace also repointed and the window from the top bedroom sandblasted.
Par Lubertozzi - Publié dans : external
Ecrire un commentaire - Voir les 0 commentaires
Lundi 24 mars 2008 1 24 /03 /Mars /2008 14:00
The front panel of the roof is finished. They have started the back panel but due to extreme bad weather the work had to stop. At the moment it is a real mess....mud, water, old wood....it is just depressing.

IMG_9825.JPG IMG_9846.JPG IMG_9852.JPG IMG_9861.JPG IMG_9864.JPG IMG_9866.JPG
The weather and the mud!

IMG_9803.JPG Natural Pool!
IMG_9819.JPG IMG_9809.JPG IMG_9894.JPG

Par Lubertozzi - Publié dans : external
Ecrire un commentaire - Voir les 0 commentaires
Lundi 24 mars 2008 1 24 /03 /Mars /2008 13:22
Will first add few photos of the previous work, taken by the neighbour.

IMGP0707.JPG IMGP0708.JPG IMGP0710.JPG IMGP0722.JPG IMGP0723.JPG IMGP0729.JPG IMGP0003.JPG IMGP0006.JPG IMGP0015.JPG IMGP0021.JPG IMGP0024.JPG IMGP0028.JPG IMGP0033.JPG
Par Lubertozzi - Publié dans : external
Ecrire un commentaire - Voir les 0 commentaires
Dimanche 9 mars 2008 7 09 /03 /Mars /2008 23:17
The roof work started last monday, and looks great!!!!! We chose the tradional tiles from the reagion,really  lovely!!! But of course it comes at a  price!

Few Photos

IMG_9719.JPG IMG_9720.JPG IMG_9721.JPG IMG_9723.JPG IMG_9725-copie-1.JPG IMG_9728.JPG IMG_9729.JPG IMG_9731.JPG IMG_9737.JPG IMG_9742.JPG
more photos to come !!! but looking wonderful!
Par Lubertozzi - Publié dans : external
Ecrire un commentaire - Voir les 1 commentaires
Dimanche 9 mars 2008 7 09 /03 /Mars /2008 22:50
This weekend few things here and there were done...we wanted to finish sandblasting but the machine was out of order .... so hopefully we will be able to finish next weekend if weather allowas......


All the rubble was cleared, thanks to Mr H that did it for free (yes we are popular !!!).
After sanding  and taking all the  concrete from around the cave, we realized that the beam on top of the door was pretty  rotten.

IMG_9726.JPG
So this weekend it was taken out and replaced.
It does looks much much better! Hopefully it will be sanded this coming weekend.

IMG_9756.JPG
The second bit was to finish the fireplace brick work . Alex added one more row of brick, but i still think we need to add 2 or 3 more bricks on each side.

IMG_9753.JPG
The back windows are almost done as well, we need help to put up the beam as it is huge and very very heavy....so it is not yet in place.

IMG_9758.JPG

Rocks had to be removed from the chicken house wall.

IMG_9759.JPG

And Finally some of the old lime was removed by hand, as it was far too thick and would need much more sand when sandblasting....

IMG_9761.JPG
As you can see the fig tree was cut down as well, for 2 reasons, the figues were not that great and it is veryyyyy veryyyy messy/
Par Lubertozzi - Publié dans : external
Ecrire un commentaire - Voir les 0 commentaires
Lundi 18 février 2008 1 18 /02 /Fév /2008 10:20
This weekend  The front window surrounding was finished as well as  the back concrete was taken down.  There is still the 2 windows to be done and the concrete staircase to be taken down....

Few pictures of the progress

IMG_9099.JPG IMG_9100.JPG IMG_9105.JPG

Picture before

IMG_8933-copie-1.JPG
after

IMG_9110.JPG
Unfortunatly ALex didnt take any photo of the process of taking the back concrete down....
So little photo of before and after

IMG_7213.JPG
After
IMG_9104.JPG IMG_9102.JPG
Par Lubertozzi - Publié dans : external
Ecrire un commentaire - Voir les 0 commentaires
Dimanche 3 février 2008 7 03 /02 /Fév /2008 19:33
First  the plaster had to be removed. Very long and boring process.

IMG_8919.JPG IMG_8920.JPG
There is only a little bit missing, because it was impossible to reach.

Now, little photo of the staircase with the metal frame+ the plastic sheets.
IMG_8922.JPG IMG_8923.JPG
After
IMG_8931.JPG IMG_8933.JPG
The metal frame was also taken down.
IMG_8936.JPG

MVI_8938
Uploaded by lubertozzi

IMG_8940.JPG
Next weekend we are going to put down the concrete staircase, it will be replaced with the tradidional rock staircase.  We are also discussing about taking down the white window surrounding...I hate it!!!! One of them is in Rock the other in concrete, it look added on and not very nice, weird is the word.

This is all preparation for the 5 days sandblasting, before the roof is done.

Par Lubertozzi - Publié dans : external
Ecrire un commentaire - Voir les 0 commentaires
Lundi 3 décembre 2007 1 03 /12 /Déc /2007 10:16
Loads of progress during the past week.  The pile of earth that was in front of the house is finally gone! ! !

IMG-7193.JPG
Septic tank is also fully in place.

IMG-7210.JPG IMG-7212.JPG IMG-7214.JPG IMG-7202.JPG

The beams are also sealed! Now Mr Picote just need to come and finish the job!

IMG-7203.JPG IMG-7204.JPG
And finally 4 windows were replaced.

IMG-7211.JPG IMG-7198.JPG
Par Lubertozzi - Publié dans : external
Ecrire un commentaire - Voir les 0 commentaires

Calendrier

Mai 2012
L M M J V S D
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      
<< < > >>
 
Créer un blog gratuit sur over-blog.com - Contact - C.G.U. - Rémunération en droits d'auteur - Signaler un abus